- Printables -
Printable cross stitch tools, designed and tested in our own stitching before they ever went up for sale. The collection covers three main areas:
- Floss storage and organisation: cards, labels, and inventory systems for keeping your DMC findable
- Project tracking: printables for keeping tabs on what you're stitching now, what's finished, and what's next in the pile
- Planning systems: bigger printable systems for organising your stitching life as a whole
Everything is an instant PDF download, designed for standard paper and binder sizes. Print as many copies as you need.
Printable cross stitch tools, designed and tested in our own stitching before they ever went up for sale. The collection covers three main areas:
- Floss storage and organisation: cards, labels, and inventory systems for keeping your DMC findable
- Project tracking: printables for keeping tabs on what you're stitching now, what's finished, and what's next in the pile
- Planning systems: bigger printable systems for organising your stitching life as a whole
Everything is an instant PDF download, designed for standard paper and binder sizes. Print as many copies as you need.
Categories
Categories
- - BEST SELLERS -
- - Bundles -
- - Printables -
- Alphabets & Lettering
- Animals & Dinosaurs
- Birth Announcements
- Bookmarks
- Fantasy
- Holidays
- Landscapes
- Nerdy & Pop Culture
- Patterns
- Plants & Garden
- Reading
- Sayings & Quotes
- Space
- Sport
- Tiny Little Countries
- Tiny Little Countries Africa
- Tiny Little Countries Americas
27 products
Sort
-
116 reviewsA printable DMC floss stash tracker mini book that folds into a pocket-sized booklet, so you can take your full stash list to the craft shop and stop buying duplicates. Track what you have, what you need, and check it at a glance while...Regular price $4.60 AUDRegular priceUnit price / per
Sale price $4.60 AUD (-0%) -
22 reviewsA bobbin-free DMC floss storage system for all 500+ shades. Wind once, braid loosely, pull one strand at a time without tangles or rewinding. This system gets rid of the two biggest floss storage headaches: re-winding bobbins every time you need a strand, and...Regular price $16.99 AUDRegular priceUnit price / per
Sale price $16.99 AUD (-0%) -
18 reviewsA single-page printable DMC floss inventory with scanned colour swatches and quantity columns, every shade on one sheet for at-a-glance reference. See your entire DMC collection at a glance. All shades on one page with accurate scanned swatches from an authentic DMC card, ready...Regular price $2.99 AUDRegular priceUnit price / per
Sale price $2.99 AUD (-0%) -
A single-page DMC floss inventory in colour order, with scanned swatches and space to track quantities. See your entire cross stitch collection at a glance, sorted by shade so a gap in your blues or a thin patch in your greens is obvious. Print...Regular price $2.99 AUDRegular priceUnit price / per
Sale price $2.99 AUD (-0%) -
3 reviewsA complete printable cross stitch organisation system: a 53-page project planner, DMC floss and needle inventory tools, and project cards in one download of 15 PDF files. Print what you need, reprint whenever you like. Everything works together as one clear system, built by...Regular price $34.95 AUDRegular priceUnit price / per
Sale price $34.95 AUD (-0%) -
2 reviewsStop buying duplicate floss. This pocket-sized DMC floss inventory mini book lists your colours in colour order and folds into a tiny 8-page booklet that slips into the notes slot of your wallet, with your whole thread library sorted by shade so a gap...Regular price $4.60 AUDRegular priceUnit price / per
Sale price $4.60 AUD (-0%) -
A beginner-friendly cross stitch finishing pattern: sew a compact Aida needle book with felt pages in an afternoon, with a 16-page photo tutorial. A great first finishing project. Stitch the front, follow the cutting and folding guide, and hand-sew or machine-stitch your way to...Regular price $5.99 AUDRegular priceUnit price / per
Sale price $5.99 AUD (-0%) -
1 reviewPrintable DMC floss inventory stickers in colour order for cross stitch, sized to stick into the planner you already carry. Track your whole stash at a glance, sorted by shade so a gap in your greens is easy to spot, with no separate booklet...Regular price $2.99 AUDRegular priceUnit price / per
Sale price $2.99 AUD (-0%) -
Printable DMC floss tracker stickers, six blocks per page, ready to trim and stick into any planner or stitching notebook. Add a clean, easy-to-use floss tracker to your planner, bullet journal, or stitching notebook. Each block lists every DMC shade with space to record...Regular price $2.99 AUDRegular priceUnit price / per
Sale price $2.99 AUD (-0%) -
Printable cross stitch planning paper with numbered grids in 7 sizes, for drafting words, motifs, borders, and layouts before you start stitching. A simple planning tool we use in our own stitching projects. Numbered margins make counting easier, planning fields on every page keep...Regular price $3.99 AUDRegular priceUnit price / per
Sale price $3.99 AUD (-0%) -
19 reviewsPrintable floss organiser cards and daily tracker for cross stitch temperature projects, ready for any year with suggested DMC colours included. Temperature projects span 365 days, which means keeping track of temperatures, colours, and floss for an entire year. This set takes the planning...Regular price $7.99 AUDRegular priceUnit price / per
Sale price $7.99 AUD (-0%) -
If you think in colour families rather than numbers, these DMC floss organiser cards put your whole stash in shade order, salmon to red to pink to blue, the way your eye actually reads it. A bobbin-free thread storage system for all 500+ colours,...Regular price $16.99 AUDRegular priceUnit price / per
Sale price $16.99 AUD (-0%) -
6 reviewsA printable cross stitch needle selection guide matching needle sizes 18–28 to Aida, evenweave, plastic canvas, waste canvas, and floss strand counts, with fabric explainers and a needle inventory. Stop guessing which needle to use. This guide shows you the right size for your...Regular price $3.49 AUDRegular priceUnit price / per
Sale price $3.49 AUD (-0%) -
4 reviewsThis printable cross stitch WIP tracker kit keeps every work in progress accounted for: see all your WIPs on one page, keep each project's details together, log your stitching sessions, and watch your stitching year build square by square. Three projects in bags, one...Regular price $3.49 AUDRegular priceUnit price / per
Sale price $3.49 AUD (-0%) -
3 reviewsPrintable cross stitch project cards that hold 8 colours each, six cards per page, sized for small projects and quick stitches. Keep your floss drops neat and easy to use with these compact project cards. Each card has 8 floss drops, space for project...Regular price $2.99 AUDRegular priceUnit price / per
Sale price $2.99 AUD (-0%) -
13 reviewsPrintable cross stitch project cards that hold up to 17 colours each, so you can kit up a project once and stitch without hunting for the next thread. Stop interrupting your stitching to search for the next colour. Transfer your project floss from your...Regular price $2.99 AUDRegular priceUnit price / per
Sale price $2.99 AUD (-0%) -
A printable DMC colour chart you can fold into your wallet. This set gives you two pocket-sized cross stitch floss inventories, one sorted by thread number and one sorted by colour. Each folds from a single sheet into a wallet-sized booklet with no glue...Regular price $6.99 AUDRegular priceUnit price / per
Sale price $6.99 AUD (-0%) -
No reviewsYour stash is beautifully organized. Your projects, meanwhile, are five mystery bags and a touch of optimism. The Cross Stitch Organizing Bundle is our printable cross stitch bundle for the stitcher with more than one project on the go. Printable floss drops keep each...Regular price $9.95 AUDRegular priceUnit price / per
Sale price $9.95 AUD (-0%) -
A three-page DMC floss inventory in colour order, with scanned swatches and a notes column beside every shade, so you can track what you own and note where you're using it. Sorted by shade so a gap in your blues or a thin patch...Regular price $2.99 AUDRegular priceUnit price / per
Sale price $2.99 AUD (-0%) -
1 reviewPrintable medium cross stitch project cards with 16 floss drops, project details, and notes space, four cards per page. Keep your stitching neat and your WIPs organised with these flat project cards. Each card holds up to 16 colours along the edges with space...Regular price $2.99 AUDRegular priceUnit price / per
Sale price $2.99 AUD (-0%) -
A printable foldable cross stitch project card with floss drops, a monthly stitching tracker, and project details, all on one page that folds to A6. Print, fold, punch, and your entire project travels with you: floss, notes, dates, and progress on one tidy card...Regular price $2.99 AUDRegular priceUnit price / per
Sale price $2.99 AUD (-0%) -
4 reviewsA printable DMC floss inventory with scanned colour swatches, shade numbers, and notes space beside every colour, current to the latest DMC chart. A detailed three-page inventory designed to help you stay organised, avoid duplicate purchases, and keep track of every shade in your...Regular price $2.99 AUDRegular priceUnit price / per
Sale price $2.99 AUD (-0%) -
2 reviewsPrintable project bag cards to record the fabric, floss, designer and dates for every WIP, so you can pick up any project without losing your place. If you've ever opened a project bag and wondered "what fabric did I use?", "who's the designer?", or...Regular price $2.99 AUDRegular priceUnit price / per
Sale price $2.99 AUD (-0%) -
28 reviewsA 53-page printable cross stitch planner to organise your WIPs, stash, goals, and notes, with watercolour poppies on every page. Bring your entire stitching life together: projects, stash, goals, and notes in one beautifully illustrated printable. With more than 50 coordinated pages, it replaces...Regular price $12.99 AUDRegular priceUnit price / per
Sale price $12.99 AUD (-0%)